| Row | Device | Activity Description | Test Date |
| 1 | COMBUSTION TURBINE #2 | REPLACED TURBINE | 10/10/2005 |
| 2 | TURBINE #2 | NOX RACT TEST | 05/18/2005 |
| 3 | TURBINE #1 | NOX RACT TEST | 05/17/2005 |
| 4 | RECOVERY KILN | RECOVERY KILN MACT AND CO TEST | 11/17/2004 |
| 5 | POWER BOILER #5 | NOX RACT TEST | 10/23/2002 |
| 6 | RECOVERY KILN | NOX RACT TEST | 10/21/2002 |
| 7 | ENTIRE FACILITY | POST METHANOL TESTING | 10/14/2002 |
| 8 | COMBUSTION TURBINE #1 | MULTIPLE LOAD TESTING ON COMBUSTION TURB | 05/23/2002 |
| 9 | COMBUSTION TURBINE #2 | MULTIPLE LOAD TESTING ON COMBUSTION TURB | 05/23/2002 |
| 10 | ENTIRE FACILITY | METHANOL REMOVAL DEMONSTRATION | 03/12/2002 |
|