| Row | Device | Activity Description | Test Date |
| 1 | LANDFILL GAS HEADER PIPE | NMOC TESTING | 12/09/2010 |
| 2 | LANDFILL GAS HEADER/PASSIVE VENTS | NMOC LANDFILL GAS | 12/08/2005 |
| 3 | ENG 1 & ENG 2 | NOX TESTING NOT REQUESTED OR REQUIRED, N | 08/20/2002 |
| 4 | LANDFILL GAS ENGINE NOX RACT TEST | STATE REQUIRED STACK TEST | 06/07/1999 |
| 5 | LANDFILL COLLECTION SYSTEM | EPA REQUIRED SOURCE TEST | 03/17/1999 |
| 6 | IC ENGINE CAT 3612 | STATE REQUIRED STACK TEST | 09/11/1996 |
| 7 | IC ENGINE CAT 3516 | STATE REQUIRED STACK TEST | 06/11/1996 |